CFD-driven optimization for a 20-meter Fishing Cutter

Design completed for new Het Schouw ferry

Sep 28, 2026

The design of the new electric cable ferry for the Het Schouw Landsmeer crossing has been completed, marking the next step in the replacement of the current ferry.

Marimecs was responsible for the naval architecture and engineering of the new ferry. The completed design has now formed the technical basis for the public tender issued by the Province of North Holland for the construction and installation of the ferry and its associated shore facilities

Design features


The new ferry will have an overall length of approximately 18 metres and a maximum load capacity of 12 tonnes. With a larger deck, the ferry is designed to accommodate three modern cars, while also providing space for cyclists and pedestrians.

Sustainability has been an important part of the design. Like the current ferry, the new ferry will be fully electrically powered. Its batteries will be charged from shore power, while solar panels on the wheelhouse roof will provide additional charging during the day.

With the tender phase now closed, the Province of North Holland will proceed with the selection of the shipyard that will build and install the new ferry. The current planning foresees construction taking place in 2027, with the new ferry expected to enter service by the end of that year.

Future proof

Marimecs delivers solutions that suit your demands by developing sustainable and future proof vessels. Would you like to know more about our efficient ship designs or refit services.

Visit

Homepage

About us

Design

Engineering

Projects

Contact

News

Job opportunities

Vacancies

Services

CFD

Naval Architecture

On-Site

Conversions and refits

Construction

Outfitting

Ship systems

Interior & exterior drawings

Rudder optimization

Visit Marimecs Group Website

Marimecs is part of the Marimecs Group, which consists of independent brands, each operating in its own field for shipyards, owners and suppliers.